Revision summary
Chandrayaan-3’s main unfinished task from Chandrayaan-2 was a soft landing and rover work on the Moon. The United States, the USSR/Russia, and China had already soft-landed; India became the fourth, and the first near the south pole, on 23 August 2023. The stack was LVM3, a propulsion module, lander Vikram, and rover Pragyan. Lander and rover carried thermophysical, seismic, ionosphere, and chemistry instruments. The Virtual Launch Control Centre at VSSC let Thiruvananthapuram teams monitor the Sriharikota countdown remotely.
Model answer
Introduction
Chandrayaan-3 in 2023 was India’s third Moon mission. Its main task was a soft landing and rover operations on the lunar surface — the step that Chandrayaan-2’s Vikram lander did not complete in 2019. On 23 August 2023 the new Vikram landed near the south pole. Only a few countries had done a soft landing before India.
Body
The task not achieved earlier
- Chandrayaan-1 (2008) orbited and impacted; it did not soft-land.
- Chandrayaan-2 (2019) placed an orbiter successfully; the Vikram lander crashed in the terminal descent.
- Chandrayaan-3 therefore flew a propulsion module, lander, and rover without a new orbiter (the Chandrayaan-2 orbiter still supported communication). The unachieved task was soft landing and surface science.
Countries that had already achieved it
- United States: Surveyor and Apollo landers.
- Soviet Union / Russia: Luna landers.
- China: Chang’e landers.
- India became the fourth country to soft-land, and the first to do so in the south polar region (a first among all, not only among those three).
Subsystems of the launched spacecraft
- Launch vehicle: Launch Vehicle Mark-3 (LVM3) from Satish Dhawan Space Centre, Sriharikota (14 July 2023).
- Propulsion module: carries the lander-rover stack from Earth orbit toward the Moon, then stays in lunar orbit; it also carried the SHAPE spectro-polarimeter for Earth observation.
- Lander (Vikram): legs, throttleable engines, navigation cameras, altimeters and velocity sensors, hazard-detection cameras, and payloads such as Chandra's Surface Thermophysical Experiment (ChaSTE), Instrument for Lunar Seismic Activity (ILSA), and Radio Anatomy of Moon Bound Hypersensitive Ionosphere and Atmosphere (RAMBHA); a NASA laser retroreflector was also on the lander.
- Rover (Pragyan): six wheels; Laser-Induced Breakdown Spectroscope and Alpha Particle X-ray Spectrometer to read surface chemistry.
- Guidance, propulsion, thermal control, and deep-space communication complete the stack.
Virtual Launch Control Centre at VSSC
- The Virtual Launch Control Centre (VLCC) at Vikram Sarabhai Space Centre (VSSC), Thiruvananthapuram, lets launch teams monitor and participate in countdown remotely while the vehicle lifts from Sriharikota.
- For Chandrayaan-3 it cut the need for every specialist to travel to the range, kept a second set of eyes on telemetry, and linked design teams at VSSC to the live launch. It contributed to a clean LVM3 launch, which is the first link in a landing that happens weeks later.
Flow diagram
flowchart TD C2[Chandrayaan-2 2019] --> F[Landing not completed] C3[Chandrayaan-3 2023] --> L[Soft landing south pole] LVM[LVM3 Sriharikota] --> PM[Propulsion module] PM --> V[Vikram lander] V --> R[Pragyan rover] VLCC[VLCC at VSSC] --> LVM
Conclusion
Chandrayaan-3’s core task was the soft landing Chandrayaan-2 missed. The United States, the Soviet Union/Russia, and China had already landed. Vikram, Pragyan, and the propulsion module did the 2023 job near the south pole. The Virtual Launch Control Centre at VSSC backed the Sriharikota launch from Thiruvananthapuram.
Quick related
Students also ask
-
The increase in life expectancy in the country has led to newer health challenges in the community. What are those challenges and what steps need to be taken to meet them ?
Next question on this syllabus topic (2022 · Q5). View answer →
-
Did Chandrayaan-3 fly a new orbiter?
No. It used a propulsion module plus lander and rover. The Chandrayaan-2 orbiter still helped with communication.
-
Was India the first country to land on the Moon?
No. It was the fourth to soft-land, and the first to soft-land in the south polar region.
PYQ trend
When UPSC asked this
Related PYQs from other years, newest first. Open a question to read it.
-
2023 · Q1 · GS III · 10 marks
Faster economic growth requires increased share of the manufacturing sector in GDP, particularly of MSMEs. Comment on the present policies of the Government in this regard. -
2023 · Q2 · GS III · 10 marks
What is the status of digitalization in the Indian economy? Examine the problems faced in this regard and suggest improvements. -
2023 · Q5 · GS III · 10 marks
Introduce the concept of Artificial Intelligence (AI). How does AI help clinical diagnosis? Do you perceive any threat to privacy of the individual in the use of AI in the healthcare? -
2023 · Q6 · GS III · 10 marks
Discuss several ways in which microorganisms can help in meeting the current fuel shortage. -
2023 · Q7 · GS III · 10 marks
Dam failures are always catastrophic, especially on the downstream side, resulting in a colossal loss of life and property. Analyze the various causes of dam failures. Give two examples of large dam failures. -
2023 · Q11 · GS III · 15 marks
Most of the unemployment in India is structural in nature. Examine the methodology adopted to compute unemployment in the country and suggest improvements. -
2023 · Q12 · GS III · 15 marks
Distinguish between 'care economy' and 'monetized economy'. How can care economy be brought into monetized economy through women empowerment? -
2023 · Q13 · GS III · 15 marks
Explain the changes in cropping pattern in India in the context of changes in consumption pattern and marketing conditions.
More from this topic
Q20 · UPSC Mains 2025 · GS III · 15 marks
Why is maritime security vital to protect India's sea trade? Discuss maritime and coastal security challenges and the way forward.
Indian Economy
About nine-tenths of India’s trade volume and most oil still move by sea, so a chokepoint shock is an economic shock. Coastal creeks, 26/11-style gaps, illegal fishing, piracy and a denser Chinese naval presence are the main challenges. Red Sea attacks in 2023–24 showed how quickly freight and insurance can jump. SAGAR, IPOI, IMAC fusion, coastal police and partner patrols are the reply. Ports and shipbuilding make security a growth story, not only a patrol story.
Q16 · UPSC Mains 2025 · GS III · 15 marks
India aims to become a semiconductor manufacturing hub. What are the challenges faced by the semiconductor industry in India? Mention the salient features of the India Semiconductor Mission.
Indian Economy
India designs many chips but still makes few, because fabs need capital, ultra-pure water, chemicals and restricted tools. Geopolitics and long project time add risk. The India Semiconductor Mission (2021) has about ₹76,000 crore for fabs, display, compound semiconductors and packaging. A design-linked incentive targets the talent India already has. Mature nodes and ATMP are the realistic near path; leading-edge logic will follow slowly if at all.
Q12 · UPSC Mains 2025 · GS III · 15 marks
Discuss the rationale of the Production Linked Incentive (PLI) scheme. What are its achievements? In what way can the functioning and outcomes of the scheme be improved?
Indian Economy
PLI is a time-bound payment on extra sales to pull manufacturing scale into India. About fourteen sectors share an outlay near two lakh crore rupees. Mobile assembly and exports are the clearest win; value addition and several heavy sectors lag. Jobs exist mainly in assembly unless design and components deepen. Reform means easier claims, MSME access, export and value-addition metrics, and a sunset.
Toppers' copies
Toppers' copies for this question will be uploaded soon.