Revision summary
EIA 2006 is the notified prior environmental clearance system under the EP Act. Draft EIA 2020 proposed post-facto clearance, shorter and narrower public hearings, and more exemptions. It also sketched more central discretion and lighter post-clearance watch. The 2020 text was a draft for comments, not a replacement gazette. Naming 2020 as enacted EIA law is a factual error.
Model answer
Introduction
EIA in India is a subordinate notification under the Environment (Protection) Act, 1986. The EIA Notification, 2006 is still the notified procedure for prior environmental clearance. The draft EIA Notification, 2020 was a MoEFCC proposal put out for comment. It was not brought into force as a final gazette replacing 2006. Any comparison is draft versus living law, not old Act versus new Act.
Body
What EIA 2006 actually is
- It is the notified regime: screening, scoping, public consultation, and appraisal, with Category A (MoEFCC and EAC) and Category B (SEIAA and SEAC).
- Prior environmental clearance is required before a listed project is built or expanded, subject to the schedule.
- Public hearing is a defined step for many Category A and B1 projects, with a notice window and a role for the local affected public, not only for files in Delhi.
- Post-clearance compliance is supposed to be monitored; violation is not meant to be a parallel easy door.
How the 2020 draft proposed to differ
- Post-facto (ex-post facto) clearance: the draft sketched a path to regularise projects that had already started without EC, with penalty. That is a break from the 2006 logic of prior clearance. Courts have since treated post-facto environmental clearance with deep suspicion; the draft’s politics were exactly this dilution.
- Public consultation thinned: shorter hearing windows, more project types moved toward B2 (no EIA, no hearing), and wider exemptions for ‘strategic’, border, and some linear or expansion cases. 2006 already had exemptions; the draft widened them.
- Centralisation and discretion: more items pulled toward the Centre; ‘strategic’ labelling could reduce disclosure.
- Compliance self-reporting and longer validity of clearances were proposed, which critics read as weaker watch after the stamp.
- Modernisation and expansion were to face lighter rungs than a new project, raising the risk of cumulative load without a fresh public test.
What did not happen
- The draft drew large public and scientific objection in 2020. No final 2020 EIA notification replaced 2006.
- Clearance practice in the years after still runs on 2006, as amended from time to time, not on a 2020 statute-like code.
- Answer-writers who call ‘EIA 2020’ the law are describing a proposal as if it were notified. That is factually wrong.
Flow diagram
flowchart TD E[EP Act 1986] --> N[EIA Notification 2006 notified] D[Draft EIA 2020] --> P[Post-facto thinner hearings] D --> X[Not brought into force] N --> L[Living clearance law] X --> N
Conclusion
EIA 2006 is the notified prior-clearance and public-hearing system. Draft EIA 2020 proposed post-facto regularisation, thinner hearings, more exemptions, and lighter compliance. It remained a draft. Until a new final notification is gazetted, 2006 is the law to name.
Quick related
Students also ask
-
What are the salient features of the Jal Shakti Abhiyan launched by the Government of India for water conservation and water security?
Next question on this syllabus topic (2020 · Q8). View answer →
-
Is EIA 2020 the current law?
No. It was a draft. The notified instrument remains the 2006 notification unless and until a new final notification is issued.
-
Did 2006 have no exemptions?
It had a schedule and exemptions. The draft fight was over widening B2, strategic labels, and post-facto entry, not over inventing categories from zero.
PYQ trend
When UPSC asked this
Related PYQs from other years, newest first. Open a question to read it.
More from this topic
Q17 · UPSC Mains 2025 · GS III · 15 marks
Mineral resources are fundamental to the country's economy and these are exploited by mining. Why is mining considered an environmental hazard? Explain the remedial measures required to reduce the environmental hazard due to mining.
Environment and Conservation
Mining underpins industry but strips forest, dirties air and water, and displaces people. Open-cast coal, metal tailings, sand mining and illegal pits are the main Indian hazard types. EIA, District Mineral Foundations, scientific closure and forest rights are the legal remedies. Illegal mining needs satellite watch and police, not only a new rule. Some deposits should remain unmined where ecology and consent fail.
Q18 · UPSC Mains 2025 · GS III · 15 marks
Write a review on India's climate commitments under the Paris Agreement (2015) and mention how these have been further strengthened in COP26 (2021). In this direction, how has the first Nationally Determined Contribution intended by India been updated in 2022?
Environment and Conservation
The 2015 NDC promised a 33–35 per cent cut in emissions intensity by 2030, 40 per cent non-fossil power capacity, and a large forest sink. COP26’s Panchamrit raised the political bar, including 500 GW non-fossil, a billion-tonne cut and net zero by 2070. In August 2022 India updated the NDC to 45 per cent intensity reduction and 50 per cent non-fossil installed capacity by 2030. Per-capita equity remains India’s diplomatic line. Pledges now need coal-path honesty and real forest carbon.
Q13 · UPSC Mains 2025 · GS III · 15 marks
Examine the factors responsible for depleting groundwater in India. What are the steps taken by the government to mitigate such depletion of groundwater?
Environment and Conservation
Most Indian irrigation still leans on groundwater, so a falling table is a farm and drinking-water crisis. Free farm power and paddy-wheat in the northwest are the classic drivers, with urban wells and weak licensing close behind. CGWB maps show over-exploited blocks across several States. Atal Bhujal, Jal Shakti Abhiyan, micro-irrigation and aquifer mapping are the main public replies. Without metering and crop change, recharge structures only delay the fall.
Toppers' copies
Toppers' copies for this question will be uploaded soon.