UDAN Scheme Challenge Mode Aerodrome Development

Why in news

  • Ministry of Civil Aviation signed 21 MoUs with States/UTs under UDAN, launching the Challenge Mode for regional aerodrome development.

Key terms

Challenge Mode Selection

A competitive framework where sub-national units compete for project funding based on merit criteria.

Underserved Aerodrome

An airport or airstrip that handles non-scheduled flights or minimal scheduled flights per week.

Viability Gap Funding (VGF)

Financial support provided by the government to subsidize economically desirable but commercially unviable infrastructure.

Regional Connectivity Scheme (RCS)

Government framework subsidizing domestic flights to link remote, unserved regional locations.

What is the UDAN Scheme?

  • Ude Desh ka Aam Nagrik (UDAN) is a regional connectivity scheme (RCS) launched in 2016 to make air travel affordable and extend connectivity to unserved and underserved airports.
  • Administered by the Ministry of Civil Aviation with the Airports Authority of India (AAI) as the implementing agency.

Introduction of Challenge Mode and progress

  • Challenge Mode introduces a competitive selection process where States/UTs bid for aerodrome development funds based on land allocation, financial concessions, and project readiness.
  • Signing of 21 bilateral MoUs operationalizes shared fiscal and administrative commitments between the Centre and States.
  • Cumulative achievements: 687 routes and 95 aerodromes operationalized, carrying over 1.71 crore passengers since inception.

Why it matters

  • Replaces uniform allocations with competitive federalism to accelerate land acquisition and local clearances for airport infrastructure.
  • Enhances economic integration of remote regions like Tezu (Arunachal Pradesh) and Purnea (Bihar).

Prelims facts

  • Under the UDAN Challenge Mode, sub-national jurisdictions compete for aerodrome development based on land readiness and local concessions.

Mains discussion

  • Examine how competitive federalism models like Challenge Mode can eliminate execution bottlenecks in regional infrastructure projects.

Source: PIB English

समान विषय · पिछले पेपर

इस विषय पर पुराना प्रश्न नहीं मिला

हमने इस नोट के लिए अभी कोई मेल खाता Prelims या Mains PYQ नहीं पाया। नया विषय हो सकता है — अभ्यास के लिए WRAP पर जुड़े पेपर देखें।

← All Prelims + Mains notes for 23 September 2026

PDF
Daily news · PIB · quiz — Free