← पिछला लेख

20 August 2026

Ken Betwa river linking

समाचार में क्यों

  • Local indigenous communities in Bundelkhand protested displacement caused by the ongoing construction of the Daudhan dam.

मुख्य शब्द

Inter-Linking of Rivers

A national civil engineering proposal to connect rivers through canals and reservoirs to transfer surplus water to drought-prone basins.

Panna Tiger Reserve

A protected area located in the Vindhyan hill range of Madhya Pradesh traversed by the Ken River.

Key points

  • The Ken-Betwa Link Project is India's first major inter-state river interlinking project implemented under the National Perspective Plan.
  • The project transfers surplus water from the Ken River in Madhya Pradesh to the water-deficit Betwa River in Uttar Pradesh to irrigate the drought-prone Bundelkhand region.
  • The central feature is the construction of the Daudhan Dam within the core area of Panna Tiger Reserve.
  • Protests stem from severe displacement concerns and the submerged loss of over 6,000 hectares of forest land, impacting local Adivasi livelihoods and wildlife habitat.

प्रीलिम्स तथ्य

  • Both Ken and Betwa rivers are right-bank tributaries of the Yamuna River originating in Madhya Pradesh.
  • The Daudhan dam construction directly impacts core habitat inside the Panna Tiger Reserve.

मेंस चर्चा

  • Evaluate the ecological, developmental, and rehabilitation trade-offs involved in large-scale inter-basin water transfer projects in India.

स्रोत: The Hindu

समान विषय · पिछले पेपर

UPSC ने यह पहले भी पूछा है

ये पिछले वर्षों के प्रश्न उसी विषय पर हैं। अभ्यास के लिए खोलें।

  1. 2018 · Q29 · UPPGS

    स्वेज नहर के बन जाने के पश्चात् भारत और युरोप के मध्य की सामुद्रिक दूरी में कितनी कमी आयी है?

    उत्तर देखें →

← सभी प्रीलिम्स + मेंस नोट्स · 20 August 2026

PDF
Daily news · PIB · quiz — Free